SCADA + Historian Retrofit

Plant-wide SCADA and historian replacement. Live process data, exception reporting, no production downtime.

The Challenge

Replace a tired SCADA — without taking the line down.

A working plant on aging supervisory software. Alarms misfiring. Historical data trapped in a database IT had stopped supporting. The brief: rip out the supervisory and historian stack and put a modern one in its place, without ever stopping production.

The Solution

Parallel cutover, scheduled changeover, no surprise downtime.

FactoryTalk View SE distributed system replaces the legacy SCADA. Dream Report carries the historian and regulatory reporting load. Old and new ran in parallel for two weeks while operators trained — then the old system decommissioned at scheduled changeover.

Multi-axis CNC machine in operation — illustrative
Next project
Illustrative · case study in development
Motion

Multi-Axis Motion Control

High-speed positioning with coordinated servos. Pick-and-place to 10-axis indexed assembly.

Allen-Bradley CompactLogixSiemens 1500Yaskawa
CallEmailQuote